RONDS AI SANO – POC Proposal & Quote Generator

Template-Matched Proposal Builder • Internal Sales Tool (Jimmy Tan)

Saved locally
—
AI Subscription
Proof of Concept Proposal
Party A: —
End User Site / Address: —
Attention: —
Party B: Ronds AI SANO Sdn Bhd
—

PROJECT AT A GLANCE

Proposed coverage Monitoring approach Service model
— Vibration and temperature data via wireless sensors, acquisition station, and cloud platform 24/7 remote diagnostic monitoring; POC duration: 30 days

Important: Final sensor quantity, equipment list, locations, installation method, acceptance targets, and binding service commitments remain subject to joint site survey and written confirmation.

1. Executive Summary

Ronds AI SANO Sdn Bhd proposes a Proof of Concept (POC) for at its to evaluate wireless condition monitoring and expert-supported diagnostics for rotating equipment supporting its . The proposed solution uses wireless sensors to collect vibration and temperature data, transmits these data through communication/acquisition stations to a cloud-based monitoring platform, and supports abnormality detection, diagnostic analysis, and maintenance recommendations.

Following the site visit on with of , the POC is proposed to cover over a -day monitoring period. The final equipment selection, sensor quantity, and sensor installation positions shall be confirmed at the site survey prior to installation.

2. POC Objectives

  • Demonstrate reliable collection, transmission, and visualization of vibration and temperature data from selected equipment.
  • Assess the ability of the platform and diagnostic experts to identify and investigate abnormal machinery conditions within the agreed monitoring scope.
  • Validate practical notification and follow-up workflows between RONDS, the appointed installation partner (), and maintenance personnel.
  • Assess the usefulness of equipment health reporting and actionable maintenance recommendations.
  • Develop a joint technical and commercial basis for continued AI subscription or wider deployment.

3. Proposed Scope of Supply & Services

Component Proposed inclusion
Wireless condition sensors Wireless vibration / temperature sensors: sensors (provisional) on assets (); final quantity and positions to be confirmed at the site survey.
Communications Related acquisition/communication stations and auxiliary accessories required for data transmission; subject to site assessment.
Monitoring platform Cloud-hosted condition monitoring software, supporting data transmission and backup services.
Diagnostic service 24/7 remote condition monitoring, intelligent alarms, and expert-supported diagnostic assessment during the agreed POC period.
Reporting Equipment health summary, abnormality diagnostic findings, maintenance guidance, and POC review report.
Technical support Remote maintenance, troubleshooting, and system support; site intervention arrangements to be agreed.
Installation Installation by partner/installer: . Installation fee: FOC. Installation plan subject to site visit and approval.

4. Equipment & Monitoring Point Register

Asset / Tag Equipment description Location No. of sensors Remarks

* Scope: , subject to confirmation at site survey.

Predictive Maintenance System Architecture
Other SystemInterface: Modbus / OPC / API
Supercare System / EPM SoftwareCloud / On-Premises AI
ServerData Processing & Storage
Remote Diagnostic Center24/7 Expert Monitoring
Ethernet / Optical fiber / 4G / 5G / WiFi
Wired Data CollectorWired Sensors (Signal Cable)
Oil Monitoring Station& Wired Camera
Wireless GatewayZigbee / LoRa Wireless Sensors
Inspection RobotAutomated Patrol
Equipment in various industries (Motors, Pumps, Gearboxes, Fans, Presses, Turbines)

System deployment is dependent on site communication coverage, network connectivity, power, permissions, and suitable sensor positions. Monitoring quality depends on data availability and coverage at the installed measurement points.

6. Monitoring & Diagnostic Methodology

6.1 Monitoring and diagnosis

RONDS’ remote diagnostic team monitors incoming condition data and reviews alarm events. Where an anomaly is detected, diagnostic engineers analyze the equipment condition and issue a technical conclusion and recommended follow-up where sufficiently supported by available data.

6.2 Reporting and consultation

  • Equipment health reporting frequency during the POC will be agreed by the parties.
  • Fault diagnosis reports may set out the observed condition, potential fault location, severity/degradation trend, and recommended inspection or maintenance actions.
  • Expert consultation and online diagnostic enablement/training may be arranged where agreed.

6.3 Potentially detectable fault categories

Within stated monitoring scope (where instrumented) Outside stated monitoring scope / limitations
Looseness, resonance, soft foot, unbalance, and misalignment Sudden failures occurring within two hours; crack-type faults
Rolling-element bearing defects and poor lubrication Electrical faults, axial displacement, bearing creeping, and faults without vibration manifestations
Gear, coupling, pulley, and belt-related abnormalities Uninstrumented components; non-rotating structural or non-drive-train faults

The POC cannot guarantee early detection of every fault. Detection depends on sensor location, equipment characteristics, fault progression, communications, and data capture. Maintenance decisions remain with .

7. Implementation Plan & Milestones

Phase Main activities Output / gate
1. Kick-off & baseline Confirm assets, stakeholders, equipment information, site access, and technical requirements. Approved POC plan and monitoring-point register
2. Installation & commissioning Install sensors / stations, establish connectivity and platform access, verify data feeds. Commissioning / connectivity checklist
3. Monitoring & evaluation Run remote monitoring, investigate events, collect user feedback, and review equipment health. Monitoring evidence and diagnostic records
4. Final evaluation Review technical performance, findings, limitations, and proposed next steps. POC evaluation / close-out report

Schedule: Installation window / POC commencement TBC  |  Monitoring duration 30 days  |  Final review on completion of the monitoring period.

8. Roles & Responsibilities

Activity Ronds AI SANO Sdn Bhd Partner / Installer:
Technical design & platform Lead Support (once appointed) Provide equipment details
Hardware installation Technical coordination Perform / coordinate installation Access, permit, and safe working conditions
Data / alarm review Lead Support as needed Provide operational context
Equipment maintenance action Recommend Coordinate as agreed Decide and implement
Connectivity and site utilities Remote troubleshooting On-site support as agreed Provide site network, power, access
POC review Provide findings Participate Evaluate and confirm outcome

The appointment, identity, and responsibilities of the installation partner are . Any POC-specific allocation of responsibility and liability will be confirmed in writing.

9. Proposed POC Acceptance Criteria

POC success criteria: TBC. The following evaluation dimensions are proposed for joint agreement; no numeric POC performance thresholds are established at this stage.

Evaluation dimension Evidence Acceptance rule
Installation and connectivity Commissioning records and device register To be jointly agreed (% online / pass criteria)
Data capture Timestamped vibration and temperature trends To be jointly agreed (sampling / completeness criteria)
Platform functionality Access to asset pages, historical trends and alarms Joint demonstration and sign-off
Diagnosis workflow Case log, engineer review and recommendations Joint review of applicable cases
Notification process Alarm notification / escalation sample Agreed contacts and channel verified
Reporting Health summary and POC final report Final report delivered and discussed

Important distinction: Any diagnostic response times, alarm measures, or performance service levels must be expressly agreed in writing before they become binding POC commitments.

10. POC Deliverables

  • Agreed equipment and sensor register ( assets / sensors, provisional; final quantity confirmed at site survey).
  • Installation and commissioning / connectivity confirmation.
  • Access to condition monitoring trends and relevant alert history.
  • Abnormality analysis and recommended corrective actions where relevant events occur.
  • POC final evaluation report, including observed capabilities, limitations, and opportunities for expansion.

11. Commercial Terms

Item Status
POC fees / waiver FOC
POC duration days; any extension to be agreed in writing
Hardware ownership and return To be confirmed in a separately agreed POC arrangement.
Installation costs and site support Installer: . Installation fee: FOC; site support scope to be jointly confirmed.
Data access, confidentiality and retention To be confirmed in POC agreement
Service levels / exclusions To be confirmed in POC agreement
Transition to Commercial AI Subscription Upon successful POC: standard AI Subscription terms – per measurement point per month (approx. at 1 USD = MYR), -month term (see Section 13.1)

12. Risks, Assumptions & Exclusions

  • Continuous monitoring depends on proper power, network communication, sensor condition, and approved installation locations.
  • Only faults within the agreed sensor coverage and vibration/temperature monitoring capability can be evaluated.
  • Unexpected sudden failures or faults without observable signatures may not be detected in advance.
  • Customer must provide operational information, safe access, and timely site feedback necessary for investigation.
  • Any repair, modification, battery replacement, and on-site technical intervention outside the agreed POC scope requires separate coordination.

13. POC Completion & Next Steps

At the end of the agreed evaluation period, the parties will review monitoring evidence, diagnostic findings, operational feedback, and acceptance results. Subject to mutual agreement, the project may proceed to extended monitoring, revisions to sensor placement, or a full AI Subscription agreement.

13.1 Transition to Commercial Subscription

Upon successful completion of the POC, the deployment may be converted to the standard AI Subscription terms: per measurement point per month (approx. at 1 USD = MYR; provisional points = / per month), a -month subscription term, with a 2-month deposit plus 1 month prepaid. Final quantities will be based on the confirmed measurement points. Conversion is subject to a separate written AI Subscription agreement.

13.2 References

Air Selangor; Fibertex (currently running an online POC).

14. Proposal Acknowledgement

Acknowledgement below confirms receipt and agreement to progress detailed POC planning; it does not replace a definitive commercial/technical agreement unless separately agreed in writing.

Party A:
—
End User Site / Address: —
Company No.: —
Signature: ___________________________
Name:
Title:
Date:
Party B:
Ronds AI SANO Sdn Bhd
Company No.: 202601026267 (1688363-A)
Signature: ___________________________
Name:
Title:
Date: